How to Install Roll Crusher

First ,you should design basis drawings, the roll crusher mounted on a solid set on the basis of specially designed in order to better withstand the machine at work of all power generated, can be placed under the sleepers in the chassis so that the entire machine of wood and wooden sleepers fit, and stay out of the material position.
On the roll crusher assembly form a complete supply, subject to careful examination of Chinese in transit longer storage process, the machine for damage, whether the slide part of the corrosion and lubrication part, determine the roll crusher intact before the installation, machine installation, and identify the level of after, and then by drawing the transmission part of the installation, elastic belt should be adjusted to the proper position, the pressure to be transferred to the appropriate location before spring.
After all the installation should strictly check the bolt fastening parts shall not loosening. This is a white big roll crusher

Roll crusher commissioning:
After installing the machine, put into pre-production, commissioning must be carried out.     
1.the aerodynamic transfer test: the machine in use on-site, must be not less than 2 hours of continuous load operation test, dynamic change when the bearing temperature must not exceed 30 ℃, the maximum temperature not more than long 40 ℃, sprocket, gear, v-belt and rollers and other parts of rotation should be smooth, no unusual noise, no collision between the rolls.
2. load test: run tests in air on a sound basis to achieve in order to load running test, load test of time not less than 8 hours continuous operation.
You should determine the actual yield of  compliance requirements, and the bearing temperature must not exceed 35 ℃, crusher should be smooth, there should be more severe vibration, the fasteners should be secure. Shall each be filled with grease. Should be well sealed, no leakage.
If you found when the production or operation does not meet the size requirements, activities can be used to adjust the bolt to adjust the back-end device, if found running unstable current fluctuations should check whether the feed size to meet the requirements, the normal stress test after can be put into production use.

Advertisements

Discussion

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Share My Crusher Blog

Add to FacebookAdd to DiggAdd to Del.icio.usAdd to StumbleuponAdd to RedditAdd to BlinklistAdd to TwitterAdd to TechnoratiAdd to Yahoo BuzzAdd to Newsvine

Steam Engine Driven Roller Crusher

Steam Engine Driven Roller Crusher in 1906

Crusher in 19th Used for Breaking Tin Ore

Crusher in 19th

A Simple Portable Rock Crusher in 20th

Rock Crusher in 20th

Crusher in 21th Could Pulverize The World’s Largest Meteorite to Pebbles in 10 Minutes

Crusher in 21th

Single Toggle Jaw Crusher is so Mini in 21th

Single Toggle Jaw Crusher

Biggest mobile crusher in 21th

Biggest mobile crusher in 21th

STONE CRUSHERS ARE COMMONLY USED ON CONSTRUCTION SITES AND IN STONE QUARRIES TO CRUSH LARGE STONES INTO SMALLER PIECES.

STONE CRUSHER

blog webmaster

%d bloggers like this: